Hinkley Point C Nuclear Power Station

Client:EDF Energy
Discharge Point:
Flow Rate:600m³/hr

Background

Hinkley Point C nuclear power station is a proposal to construct a 3,200 MWe nuclear power station with two EPR reactors in Somerset, England.

The Overall Objective

During works there was the requirement to treat waters with coagulant and flocculant before safe discharge.

Solution

At peak there were 5 Chemical Dosing Systems in use at one time and dealing with flow rates of up to 600m³/hr.

The system monitored the inflow of water and only dosed with chemical when required. In addition to this the out flow was monitored to ensure the treated water remained within the parameters set before safe discharge.

Back to top
We're at the #EWWM conference today and tomorrow. Drop by for a chat about DAF, MBBR and Lamella water treatment so… https://t.co/WRc15K09lJ
9:58 AM 17 Jul 2018 Join the conversation
A few places remaining on the Siltbuster 2-day Environmental Professionals CPD course in Reading 18/19 July. Book n… https://t.co/OqWZhuWCfb
9:26 AM 3 Jul 2018 Join the conversation
Another batch of HB50Es are ready and on their way to our partner Telstar in France to further support the surface… https://t.co/HBXJcNat1o
2:16 PM 28 Jun 2018 Join the conversation
Download your free copy of Siltbuster's white paper explaining the EA's Regulatory Position Statement – “Temporary… https://t.co/rKmmA0d1NS
10:41 AM 22 Jun 2018 Join the conversation
We’ve got new positions (Senior Process Design Engineer and Technical Sales Engineer – Municipal) on our website… https://t.co/gs1qEKjqZX
9:22 AM 15 Jun 2018 Join the conversation