Hinkley Point C Nuclear Power Station

Client:EDF Energy
Discharge Point:
Flow Rate:600m³/hr

Background

Hinkley Point C nuclear power station is a proposal to construct a 3,200 MWe nuclear power station with two EPR reactors in Somerset, England.

The Overall Objective

During works there was the requirement to treat waters with coagulant and flocculant before safe discharge.

Solution

At peak there were 5 Chemical Dosing Systems in use at one time and dealing with flow rates of up to 600m³/hr.

The system monitored the inflow of water and only dosed with chemical when required. In addition to this the out flow was monitored to ensure the treated water remained within the parameters set before safe discharge.

Back to top
SPS will be at the Ricoh arena next week, exhibiting at this year's @FDBexpo (stand s02). Register for FREE now at… https://t.co/Z5M6bpWr99
3:30 PM 25 Sep 2018 Join the conversation
SPS will be at next month's Food and Drink show in Coventry with Dave Gaskill speaking. Register to attend for free… https://t.co/RV0NNaHCxv
9:46 AM 17 Sep 2018 Join the conversation
Our 1 day Managing Water Pollution on Construction Sites CPD training course is coming to the Welsh capital on the… https://t.co/1I1q4iZyL7
1:06 PM 10 Sep 2018 Join the conversation
Siltbuster can help advise. For more information read our post: https://t.co/uF1rKwwCs7 https://t.co/GGR01lLw0T
11:19 AM 4 Sep 2018 Join the conversation
We're excited for this weekend's raft race on the beautiful river Wye. This year we're entering a joint team with o… https://t.co/mv4ti6tmr4
11:58 AM 31 Aug 2018 Join the conversation