Henry Construction High Rise Apartments

Client:Henry Construction

Background

Henry Construction were carrying out construction works to build a number of apartments in West London.

The Overall Objective

During the construction work large concrete pours with up to 20 concrete trucks per day distributing the concrete onsite, therefore leading to the requirement for a treatment solution to deal with the concrete wash water.

Solution

Siltbuster installed an RCW unit to fulfill their obligations under the Environment Agency’s Regulatory Position Statement (RPS) ‘Managing concrete wash waters on construction sites’ and ensure the water was suitable for safe discharge.

Back to top
Some Siltbusters looking good in the sun! These two lorries are heading for a large infrastructure project in Somer… https://t.co/BmZzh1wz6g
1:36 PM 19 Apr 2018 Join the conversation
SPS and Suez cooperate to deliver clean water for Italian fertilizer manufacturer under highly variable conditions… https://t.co/WtqxqjrdAJ
3:52 PM 17 Apr 2018 Join the conversation
Glad to be part of the event and looking forward to some interesting conversations. https://t.co/OZFOOrExk0
12:02 PM 11 Apr 2018 Join the conversation
Great feedback from our recent win. https://t.co/zb7TtkObao https://t.co/0rhjSppOfZ
1:24 PM 27 Mar 2018 Join the conversation