Henry Construction High Rise Apartments

Client:Henry Construction

Background

Henry Construction were carrying out construction works to build a number of apartments in West London.

The Overall Objective

During the construction work large concrete pours with up to 20 concrete trucks per day distributing the concrete onsite, therefore leading to the requirement for a treatment solution to deal with the concrete wash water.

Solution

Siltbuster installed an RCW unit to fulfill their obligations under the Environment Agency’s Regulatory Position Statement (RPS) ‘Managing concrete wash waters on construction sites’ and ensure the water was suitable for safe discharge.

Back to top
We're at the #EWWM conference today and tomorrow. Drop by for a chat about DAF, MBBR and Lamella water treatment so… https://t.co/WRc15K09lJ
9:58 AM 17 Jul 2018 Join the conversation
A few places remaining on the Siltbuster 2-day Environmental Professionals CPD course in Reading 18/19 July. Book n… https://t.co/OqWZhuWCfb
9:26 AM 3 Jul 2018 Join the conversation
Another batch of HB50Es are ready and on their way to our partner Telstar in France to further support the surface… https://t.co/HBXJcNat1o
2:16 PM 28 Jun 2018 Join the conversation
Download your free copy of Siltbuster's white paper explaining the EA's Regulatory Position Statement – “Temporary… https://t.co/rKmmA0d1NS
10:41 AM 22 Jun 2018 Join the conversation
We’ve got new positions (Senior Process Design Engineer and Technical Sales Engineer – Municipal) on our website… https://t.co/gs1qEKjqZX
9:22 AM 15 Jun 2018 Join the conversation