Background

Heathrow Airport is the UK’s premier international airport where some 80 airlines fly direct to over 180 destinations worldwide. During improvement works to repair and upgrade a main perimeter road, excavations were dug in the central reservations for work to be carried out.

Due to work being carried out in close proximity to a local canal and also the area having a high water table, the excavations quickly filled with solid laden water.

The Overall Objective

With the ingression of water at multiple locations, numerous pumps were required to continually dewater the working area but further required a treatment system able to deal with the solid laden water.

Solution

Siltbuster initially provided an FB50 settlement unit to address a single section however, off the back of its success 3 more were hired to ensure the waters being discharged to the surface water drain were of a suitable quality.

 

Back to top
Some Siltbusters looking good in the sun! These two lorries are heading for a large infrastructure project in Somer… https://t.co/BmZzh1wz6g
1:36 PM 19 Apr 2018 Join the conversation
SPS and Suez cooperate to deliver clean water for Italian fertilizer manufacturer under highly variable conditions… https://t.co/WtqxqjrdAJ
3:52 PM 17 Apr 2018 Join the conversation
Glad to be part of the event and looking forward to some interesting conversations. https://t.co/OZFOOrExk0
12:02 PM 11 Apr 2018 Join the conversation
Great feedback from our recent win. https://t.co/zb7TtkObao https://t.co/0rhjSppOfZ
1:24 PM 27 Mar 2018 Join the conversation