Garston Gasworks

Client:Erith Contractors
Flow Rate:25m³/hr

Background

Garston Gasworks were known for producing carburetted water gas, with coal gas being produced from 1921. The works later had an oil pipeline to the docks.

the works has not been in use since 2008 and was due to be decontaminated and demolished to make space for redevelopment in the area.

The Overall Objective

Erith Contractors were tasked with dewatering 2 gasholder basins to allow for decontamination of the site and subsequent removal of the existing structures in place. The site would then be back filled and used for redevelopment.

Solution

Siltbuster provided Erith with their FB50 plus a CM400 to dewater the site and settle mineral solids before discharging the water safely to the surrounding environment.

Back to top
We're at the #EWWM conference today and tomorrow. Drop by for a chat about DAF, MBBR and Lamella water treatment so… https://t.co/WRc15K09lJ
9:58 AM 17 Jul 2018 Join the conversation
A few places remaining on the Siltbuster 2-day Environmental Professionals CPD course in Reading 18/19 July. Book n… https://t.co/OqWZhuWCfb
9:26 AM 3 Jul 2018 Join the conversation
Another batch of HB50Es are ready and on their way to our partner Telstar in France to further support the surface… https://t.co/HBXJcNat1o
2:16 PM 28 Jun 2018 Join the conversation
Download your free copy of Siltbuster's white paper explaining the EA's Regulatory Position Statement – “Temporary… https://t.co/rKmmA0d1NS
10:41 AM 22 Jun 2018 Join the conversation
We’ve got new positions (Senior Process Design Engineer and Technical Sales Engineer – Municipal) on our website… https://t.co/gs1qEKjqZX
9:22 AM 15 Jun 2018 Join the conversation