Frontier Park, Blackburn

Client:Barnfield Construction
Discharge Point:Surface Watercourse
Flow Rate:40m3/hr

Background

Barnfield Construction are construction partners on a 93 acre complex multi-use development involving large scale earthworks and site re-profiling at junction six of the M65. The multi-million pound industrial and leisure development is expected to create nearly 2,000 jobs. Frontier Park will comprise around 1 million sq ft of new warehouse and industrial building, and a new services types area off the junction, which will include a petrol station, a drive-through Starbucks and drive-through KFC restaurant, a Greggs Bakery, Subway and a retail outlet.

 

The Overall Objective

The massive site area and soil strip caused big problems during rainfall events. Even light rain showers caused significant volumes of heavily silt laden discoloured water to run through the site and discharge to watercourse, risking prosecution from the Environment Agency. The site manager had used every trick he could think of (lagoons, silt traps, straw bales, settlement tanks) but the water was still very dirty so Siltbuster were called in to help protect the environment and prevent a large fine and bad publicity.

 

Solution

Siltbuster attended site, assessed the situation, made suggestions to adjust earthworks so all runoff was collected in one place. Siltbuster sampled the water and conducted field dosing trials and demonstrated 2-stage chemical dosing was the only way to ensure visually clear water was discharged from the site. By keeping the lagoon at a low level there is plenty of attenuation capacity for the next storm event.

Back to top
We're at the #EWWM conference today and tomorrow. Drop by for a chat about DAF, MBBR and Lamella water treatment so… https://t.co/WRc15K09lJ
9:58 AM 17 Jul 2018 Join the conversation
A few places remaining on the Siltbuster 2-day Environmental Professionals CPD course in Reading 18/19 July. Book n… https://t.co/OqWZhuWCfb
9:26 AM 3 Jul 2018 Join the conversation
Another batch of HB50Es are ready and on their way to our partner Telstar in France to further support the surface… https://t.co/HBXJcNat1o
2:16 PM 28 Jun 2018 Join the conversation
Download your free copy of Siltbuster's white paper explaining the EA's Regulatory Position Statement – “Temporary… https://t.co/rKmmA0d1NS
10:41 AM 22 Jun 2018 Join the conversation
We’ve got new positions (Senior Process Design Engineer and Technical Sales Engineer – Municipal) on our website… https://t.co/gs1qEKjqZX
9:22 AM 15 Jun 2018 Join the conversation