Background

With over 40 years experience and supported by a dedicated team of qualified and experienced staff, Forkers provides a broad range of Civil and Ground Engineering services to both the public and private sectors.

During Road Bridge repair work, Forkers were required to replace existing pipework without affecting the integrity of the bridge.

The Overall Objective

Forkers required a solution able to fit within limited footprint to effectively treat high pH water as a result of Hydrodemolition.

Solution

As a result of the hydrodemolition work carried out, Siltbuster initially installed a HD unit followed by its DS4 FB50 unit to effectively treat the high pH wash water. Once treated, the water was then able to be discharged to a nearby surface watercourse.

Back to top
We're at the #EWWM conference today and tomorrow. Drop by for a chat about DAF, MBBR and Lamella water treatment so… https://t.co/WRc15K09lJ
9:58 AM 17 Jul 2018 Join the conversation
A few places remaining on the Siltbuster 2-day Environmental Professionals CPD course in Reading 18/19 July. Book n… https://t.co/OqWZhuWCfb
9:26 AM 3 Jul 2018 Join the conversation
Another batch of HB50Es are ready and on their way to our partner Telstar in France to further support the surface… https://t.co/HBXJcNat1o
2:16 PM 28 Jun 2018 Join the conversation
Download your free copy of Siltbuster's white paper explaining the EA's Regulatory Position Statement – “Temporary… https://t.co/rKmmA0d1NS
10:41 AM 22 Jun 2018 Join the conversation
We’ve got new positions (Senior Process Design Engineer and Technical Sales Engineer – Municipal) on our website… https://t.co/gs1qEKjqZX
9:22 AM 15 Jun 2018 Join the conversation