Removal of Dissolved Metal on Humber Pipeline Project

Client: Porr Skanska A Hak

Discharge Point: Flooding of Tunnel with ultra-pure water

Flow Rate: up to 120m3/hr

Site Name: The Humber, outside Hull

Contamination: Dissolved Metals in Water