Countess Weir Flood Defence Scheme

Client:TMS Ltd
Flow Rate:30m³/hr

Background

TMS Ltd were commissioned by the Environment Agency to make modifications to the existing weir at Countess Weir in Exeter as part of a flood alleviation scheme.

The Overall Objective

The defence scheme will run for some four miles along the river and includes erecting flood-proof glass-panels and demount-able barriers, raising the level of footpaths and building up walls and embankments on both sides of the river. The scheme will reduce the flood risk to over 3,000 homes in the area.

As part of the works a coffer dam was installed leading tot he requirement for a suitable treatment system for high TSS and high pH waters prior to discharge.

Solution

Siltbuster installed a 3 Stage Chemical Dosing System able to treat between 20m³ and 30m³/hr whilst neutralising the high pH water and reducing the suspended solids to be below 40mg/l.

Back to top
Siltbuster are in Stockholm to exhibit at 'Renare Mark' (Cleaner Ground) with our long time partner Clean Water Eng… https://t.co/lqtNKKu2Lu
2:28 PM 20 Mar 2019 Join the conversation
Equipment is only part of the Solution when it comes to complying with Environmental Legislation. Discover what els… https://t.co/Z628ffEeiO
8:58 AM 19 Mar 2019 Join the conversation
Siltbuster are supporting #RedNoseDay with a cake sale and competition at our Monmouth HQ to raise money to support… https://t.co/Nih1hUbsSR
10:01 AM 15 Mar 2019 Join the conversation
Following our success in winning the Construction News Specialists Award 2018, Siltbuster have been shortlisted for… https://t.co/OFnUIsslcr
2:55 PM 13 Mar 2019 Join the conversation
Our first 1 day practical pollution awareness course will be at Cadbury World, Birmingham on the 27th March. Book y… https://t.co/xhiwfisNEd
1:30 PM 8 Feb 2019 Join the conversation