Countess Weir Flood Defence Scheme

Client:TMS Ltd
Flow Rate:30m³/hr

Background

TMS Ltd were commissioned by the Environment Agency to make modifications to the existing weir at Countess Weir in Exeter as part of a flood alleviation scheme.

The Overall Objective

The defence scheme will run for some four miles along the river and includes erecting flood-proof glass-panels and demount-able barriers, raising the level of footpaths and building up walls and embankments on both sides of the river. The scheme will reduce the flood risk to over 3,000 homes in the area.

As part of the works a coffer dam was installed leading tot he requirement for a suitable treatment system for high TSS and high pH waters prior to discharge.

Solution

Siltbuster installed a 3 Stage Chemical Dosing System able to treat between 20m³ and 30m³/hr whilst neutralising the high pH water and reducing the suspended solids to be below 40mg/l.

Back to top
Some Siltbusters looking good in the sun! These two lorries are heading for a large infrastructure project in Somer… https://t.co/BmZzh1wz6g
1:36 PM 19 Apr 2018 Join the conversation
SPS and Suez cooperate to deliver clean water for Italian fertilizer manufacturer under highly variable conditions… https://t.co/WtqxqjrdAJ
3:52 PM 17 Apr 2018 Join the conversation
Glad to be part of the event and looking forward to some interesting conversations. https://t.co/OZFOOrExk0
12:02 PM 11 Apr 2018 Join the conversation
Great feedback from our recent win. https://t.co/zb7TtkObao https://t.co/0rhjSppOfZ
1:24 PM 27 Mar 2018 Join the conversation