Corrib Gas Pipeline Construction

Client:Corrib, Roadbridge
Discharge Point:Surface Watercourse
Flow Rate:100m³/hr

Background

Roadbridge were carrying out construction work worth 180m Euros to install 3.5 km of gas pipeline and other services from Corrib Gas Pipeline terminal to Landfall Valve.

Roadbridge is a leader in Civil Engineering. Roadbridge has the experience, capability and a proven track record in delivering major projects across a range of sectors

The Overall Objective

Corrib required water treatment to cope with flows on average up to 100m³/hr.

Solution

Siltbuster installed multiple systems comprising of 6 Dosing Containers, 10 HB50 units, 3 CM400’s. 3 Mix Tanks and an ISO Tank. The discharge criteria was below 5mg/l and the Siltbuster systems installed consistently achieved below this number.

Back to top
SPS will be at the Ricoh arena next week, exhibiting at this year's @FDBexpo (stand s02). Register for FREE now at… https://t.co/Z5M6bpWr99
3:30 PM 25 Sep 2018 Join the conversation
SPS will be at next month's Food and Drink show in Coventry with Dave Gaskill speaking. Register to attend for free… https://t.co/RV0NNaHCxv
9:46 AM 17 Sep 2018 Join the conversation
Our 1 day Managing Water Pollution on Construction Sites CPD training course is coming to the Welsh capital on the… https://t.co/1I1q4iZyL7
1:06 PM 10 Sep 2018 Join the conversation
Siltbuster can help advise. For more information read our post: https://t.co/uF1rKwwCs7 https://t.co/GGR01lLw0T
11:19 AM 4 Sep 2018 Join the conversation
We're excited for this weekend's raft race on the beautiful river Wye. This year we're entering a joint team with o… https://t.co/mv4ti6tmr4
11:58 AM 31 Aug 2018 Join the conversation