Corrib Gas Pipeline Construction

Client:Corrib, Roadbridge
Discharge Point:Surface Watercourse
Flow Rate:100m³/hr

Background

Roadbridge were carrying out construction work worth 180m Euros to install 3.5 km of gas pipeline and other services from Corrib Gas Pipeline terminal to Landfall Valve.

Roadbridge is a leader in Civil Engineering. Roadbridge has the experience, capability and a proven track record in delivering major projects across a range of sectors

The Overall Objective

Corrib required water treatment to cope with flows on average up to 100m³/hr.

Solution

Siltbuster installed multiple systems comprising of 6 Dosing Containers, 10 HB50 units, 3 CM400’s. 3 Mix Tanks and an ISO Tank. The discharge criteria was below 5mg/l and the Siltbuster systems installed consistently achieved below this number.

Back to top
Gritbuster on the box! Filming for CBeebies "Do You Know?" took place yesterday at a large road sweeper depot in Te… https://t.co/c3ARSny7tE
8:28 AM 9 Apr 2019 Join the conversation
Whoever you are, wherever you are, water is your human right. 2.1 billion people live without safe water at home. T… https://t.co/ZdtHVcK9JK
9:53 AM 22 Mar 2019 Join the conversation
Siltbuster are in Stockholm to exhibit at 'Renare Mark' (Cleaner Ground) with our long time partner Clean Water Eng… https://t.co/lqtNKKu2Lu
2:28 PM 20 Mar 2019 Join the conversation
Equipment is only part of the Solution when it comes to complying with Environmental Legislation. Discover what els… https://t.co/Z628ffEeiO
8:58 AM 19 Mar 2019 Join the conversation
Siltbuster are supporting #RedNoseDay with a cake sale and competition at our Monmouth HQ to raise money to support… https://t.co/Nih1hUbsSR
10:01 AM 15 Mar 2019 Join the conversation