Bentley Motors Drainage Installation

Client:Bentley Motors

Background

Bentley Motors were installing new concrete drainage across their 5.5 hectare site in Crewe. Bentley Motors Limited design, develop, and manufacture luxury motorcars which are largely hand-built.

The Overall Objective

Due to the volumes of concrete being poured there was an issue with some leakage into the lagoons onsite, leading to an increase in the pH levels.

Bentley attended one of our Managing Pollution on Construction Sites CPD courses and as a direct result, asked Siltbuster to provide a suitable treatment solution to effectively treat the pH 10 water to be between 6-9 and subsequently safely discharged.

Solution

Siltbuster supplied a PMPU20 unit and installed onsite in November 2015 and has been in continuous use since. The unit has proved so successful that Bentley are now purchasing the unit as a permanent installation.

Back to top
Merry Christmas from Siltbuster and SPS! Can you spot the squidgy Siltbuster decorations on our tree? https://t.co/ND5al47lAF
1:12 PM 12 Dec 2018 Join the conversation
The product of 2 years worth of research and development between market leaders within their respective fields, the… https://t.co/pCfwxPZi4D
4:38 PM 19 Nov 2018 Join the conversation
The Siltbuster CPD training courses are coming to Chelsea Football Stadium on 21st Nov. Book online now… https://t.co/VaWZjH8KhL
1:40 PM 2 Nov 2018 Join the conversation
Our next Managing Water Pollution on Construction Sites CPD training course is coming to Liverpool on the 31st Oct.… https://t.co/s4tnaRgSVZ
7:59 AM 16 Oct 2018 Join the conversation
We were pleased to raise money for @macmillancancer by holding a coffee morning last week. The cakes from Claire an… https://t.co/AT1KWGtjT3
8:42 AM 8 Oct 2018 Join the conversation