Bentley Motors Drainage Installation

Client:Bentley Motors

Background

Bentley Motors were installing new concrete drainage across their 5.5 hectare site in Crewe. Bentley Motors Limited design, develop, and manufacture luxury motorcars which are largely hand-built.

The Overall Objective

Due to the volumes of concrete being poured there was an issue with some leakage into the lagoons onsite, leading to an increase in the pH levels.

Bentley attended one of our Managing Pollution on Construction Sites CPD courses and as a direct result, asked Siltbuster to provide a suitable treatment solution to effectively treat the pH 10 water to be between 6-9 and subsequently safely discharged.

Solution

Siltbuster supplied a PMPU20 unit and installed onsite in November 2015 and has been in continuous use since. The unit has proved so successful that Bentley are now purchasing the unit as a permanent installation.

Back to top
SPS will be at the Ricoh arena next week, exhibiting at this year's @FDBexpo (stand s02). Register for FREE now at… https://t.co/Z5M6bpWr99
3:30 PM 25 Sep 2018 Join the conversation
SPS will be at next month's Food and Drink show in Coventry with Dave Gaskill speaking. Register to attend for free… https://t.co/RV0NNaHCxv
9:46 AM 17 Sep 2018 Join the conversation
Our 1 day Managing Water Pollution on Construction Sites CPD training course is coming to the Welsh capital on the… https://t.co/1I1q4iZyL7
1:06 PM 10 Sep 2018 Join the conversation
Siltbuster can help advise. For more information read our post: https://t.co/uF1rKwwCs7 https://t.co/GGR01lLw0T
11:19 AM 4 Sep 2018 Join the conversation
We're excited for this weekend's raft race on the beautiful river Wye. This year we're entering a joint team with o… https://t.co/mv4ti6tmr4
11:58 AM 31 Aug 2018 Join the conversation