BAM Nuttall were carrying out work as part of the M1 widening scheme. During works our client was granted a permit to discharge 2 m³/day of treated concrete washwater into a motorway drainage channel which linked into a surface watercourse.

The Overall Objective

Washdown waters from the onsite batching plant and the 7 no. lorries that were feeding the slipform paving machines on the motorway, were held in a catchpit.

Solution

At the end of each day 2 m³ of water was transferred into the water holding tank and treated using the pHD unit ready for discharge to the surface watercourse in the morning.

Back to top
SPS will be at the Ricoh arena next week, exhibiting at this year's @FDBexpo (stand s02). Register for FREE now at… https://t.co/Z5M6bpWr99
3:30 PM 25 Sep 2018 Join the conversation
SPS will be at next month's Food and Drink show in Coventry with Dave Gaskill speaking. Register to attend for free… https://t.co/RV0NNaHCxv
9:46 AM 17 Sep 2018 Join the conversation
Our 1 day Managing Water Pollution on Construction Sites CPD training course is coming to the Welsh capital on the… https://t.co/1I1q4iZyL7
1:06 PM 10 Sep 2018 Join the conversation
Siltbuster can help advise. For more information read our post: https://t.co/uF1rKwwCs7 https://t.co/GGR01lLw0T
11:19 AM 4 Sep 2018 Join the conversation
We're excited for this weekend's raft race on the beautiful river Wye. This year we're entering a joint team with o… https://t.co/mv4ti6tmr4
11:58 AM 31 Aug 2018 Join the conversation