BAM Nuttall M1 Widening Scheme

Client:BAM Nuttall

Background

BAM Nuttall were carrying out work as part of the M1 widening scheme. During works our client was granted a permit to discharge 2 m³/day of treated concrete washwater into a motorway drainage channel which linked into a surface watercourse.

The Overall Objective

Washdown waters from the onsite batching plant and the 7 no. lorries that were feeding the slipform paving machines on the motorway, were held in a catchpit.

Solution

At the end of each day 2 m³ of water was transferred into the water holding tank and treated using the pHD unit ready for discharge to the surface watercourse in the morning.

Back to top
Siltbuster are in Stockholm to exhibit at 'Renare Mark' (Cleaner Ground) with our long time partner Clean Water Eng… https://t.co/lqtNKKu2Lu
2:28 PM 20 Mar 2019 Join the conversation
Equipment is only part of the Solution when it comes to complying with Environmental Legislation. Discover what els… https://t.co/Z628ffEeiO
8:58 AM 19 Mar 2019 Join the conversation
Siltbuster are supporting #RedNoseDay with a cake sale and competition at our Monmouth HQ to raise money to support… https://t.co/Nih1hUbsSR
10:01 AM 15 Mar 2019 Join the conversation
Following our success in winning the Construction News Specialists Award 2018, Siltbuster have been shortlisted for… https://t.co/OFnUIsslcr
2:55 PM 13 Mar 2019 Join the conversation
Our first 1 day practical pollution awareness course will be at Cadbury World, Birmingham on the 27th March. Book y… https://t.co/xhiwfisNEd
1:30 PM 8 Feb 2019 Join the conversation