American Embassy Construction

Client:O'keefe Contractors

Background

During the construction of civil works at the American Embassy site in London by O’keefe Contractors, solid laden water along with free phase hydrocarbon were encountered onsite.

Ground was broken on November 13, 2013, and the building is expected to be complete by 2017.

 

The Overall Objective

Siltbuster were tasked with dealing with two problems, the first was to remove suspended solids from the water onsite and secondly to remove the hydrocarbon to allow for safe discharge offsite.

 

Solution

Siltbuster installed its HB50-OWS (Oil Water Separator), to effectively treat the suspended solids and remove the free phase hydrocarbon by skimming it off and safely capturing it before removal from site.

 

Back to top
We were pleased to raise money for @macmillancancer by holding a coffee morning last week. The cakes from Claire an… https://t.co/AT1KWGtjT3
8:42 AM 8 Oct 2018 Join the conversation
Our open day is underway! https://t.co/khoNExHdSh
2:32 PM 5 Oct 2018 Join the conversation
Get an overview of what Siltbuster does! Join us tomorrow between 2pm and 4.30pm for our Open Afternoon. Get a tour… https://t.co/bzqbT7rKCE
1:22 PM 4 Oct 2018 Join the conversation
SPS will be at the Ricoh arena next week, exhibiting at this year's @FDBexpo (stand s02). Register for FREE now at… https://t.co/Z5M6bpWr99
3:30 PM 25 Sep 2018 Join the conversation
SPS will be at next month's Food and Drink show in Coventry with Dave Gaskill speaking. Register to attend for free… https://t.co/RV0NNaHCxv
9:46 AM 17 Sep 2018 Join the conversation