Background

Alun Griffiths were completing construction of a new road in the Cross Hands area of West Wales. With 11 hectares of land exposed during one of the wettest periods of 2014, a large purpose built attenuation pond quickly filled with surface water runoff.

The Overall Objective

As the weather continued to deteriorate, more solid laden water run off seeped into the lagoon. To avoid causing pollution, Siltbuster were tasked with treating the water.

Solution

Siltbuster installed a 2 stage flow proportional chemical treatment system at short notice, capable of achieving a flow rate of up to 100m³/hr. The digital dosing equipment used, eliminated any pollution risks and the water standards achieved were among the highest standards.

Back to top
SPS will be at the Ricoh arena next week, exhibiting at this year's @FDBexpo (stand s02). Register for FREE now at… https://t.co/Z5M6bpWr99
3:30 PM 25 Sep 2018 Join the conversation
SPS will be at next month's Food and Drink show in Coventry with Dave Gaskill speaking. Register to attend for free… https://t.co/RV0NNaHCxv
9:46 AM 17 Sep 2018 Join the conversation
Our 1 day Managing Water Pollution on Construction Sites CPD training course is coming to the Welsh capital on the… https://t.co/1I1q4iZyL7
1:06 PM 10 Sep 2018 Join the conversation
Siltbuster can help advise. For more information read our post: https://t.co/uF1rKwwCs7 https://t.co/GGR01lLw0T
11:19 AM 4 Sep 2018 Join the conversation
We're excited for this weekend's raft race on the beautiful river Wye. This year we're entering a joint team with o… https://t.co/mv4ti6tmr4
11:58 AM 31 Aug 2018 Join the conversation