Case Studies

Siltbuster Ltd has extensive experience in water treatment covering a diverse range of industries and materials. Detailed below are range of Siltbuster case studies for the key sectors we cover detailing the solutions we have provided.

SECTOR:
PRODUCT:
Llanishen Reservoir
Frontier Park, Blackburn
Wentwood Reservoir
Aberdeen Western Peripheral Route
Trago Mills Construction
Aldi Rhuddlan Construction
Westnewton Bridge
Wimbleball Dam
Hinkley Point C Nuclear Power Station
Copenhagen Metro Line
Student Accommodation, Cardiff
Sirius Group Construction
LK Group Construction Site
Slade Heath Pumping Station Construction
BKP Waste Recycling Ltd
Hotel Construction
Doha Metro Construction – Phase 3
Doha Metro Construction – Phase 2
Doha Metro Construction – Phase 1
Cornwall Energy Recovery Centre
Huntsman Pigments and Additives
Hogan Concrete
Jaguar Landrover Manufacturing Plant
Pump Station Upgrades
Heads of the Valley A465 Section 1
Heads of the Valley A465 Section 2
Heads of the Valley A465 Section 3
Garston Gasworks
Corrib Gas Pipeline Construction
Queensbury Tunnel Repairs
Countess Weir Flood Defence Scheme
Bison Manufacturing
Bentley Motors Drainage Installation
Falmouth Dry Docks
Lynch Plant Hire Wind Turbine Bases
Malin Floors industrial Concrete Floors
BAM Nuttall M1 Widening Scheme
Henry Construction High Rise Apartments
Easycrete Concrete Supplier
M1, Junction 19 Construction
Network Rail Bridge Improvement
Airbus Manufacturing Facility
Renaker Build Apartment Block Construction
Forkers Road Bridge Repairs
Osborne Construction Bridge Pillar Repairs
Colwell Groundworks wall reinforcements
Sabre Jetting Bridge Decking Repairs
Davyhulme Waste Water Treatment Works
Papworth Hospital Construction
Alun Griffiths Road Construction
Tully Quarry
CPC Civils Cofferdam Installation
Bam Nuttall New Electric Substation
Jaguar Land Rover car park construction
Glendinning Pigsdon Quarry
Kier Construction A30 Improvement Scheme
T & M Cable Services Construction Works
London City Centre Dewatering
Ynysangharad Park Redevelopment
Cormac Construction Truro
Rhigos Mountain wind farm
Heathrow Airport Road Construction
Battersea Power Station Decomissioning
American Embassy Construction
Back to top
We're at the #EWWM conference today and tomorrow. Drop by for a chat about DAF, MBBR and Lamella water treatment so… https://t.co/WRc15K09lJ
9:58 AM 17 Jul 2018 Join the conversation
A few places remaining on the Siltbuster 2-day Environmental Professionals CPD course in Reading 18/19 July. Book n… https://t.co/OqWZhuWCfb
9:26 AM 3 Jul 2018 Join the conversation
Another batch of HB50Es are ready and on their way to our partner Telstar in France to further support the surface… https://t.co/HBXJcNat1o
2:16 PM 28 Jun 2018 Join the conversation
Download your free copy of Siltbuster's white paper explaining the EA's Regulatory Position Statement – “Temporary… https://t.co/rKmmA0d1NS
10:41 AM 22 Jun 2018 Join the conversation
We’ve got new positions (Senior Process Design Engineer and Technical Sales Engineer – Municipal) on our website… https://t.co/gs1qEKjqZX
9:22 AM 15 Jun 2018 Join the conversation